Construction of new complete cement production lines And other projects Inside and outside Egypt “Refractory and insulation”
  • Constructing Helwan cement company line production “1” May 4, 1981.
  • Constructing line “1” Suez Cement Company in 1981.
  • Constructing Helwan Cement Company line production “2” May 17, 1983.
  • Constructing line ” 1” Assiut Cement Company on February 17,1984.
  • Constructing Kattameya Cement Company in March 1984.
  • Constructing Tourah Cement Co. lines 8&9 on October 16, 1984-1985.
  • Constructing El Menia Cement Company in 1986.
  • Constructing line “2” Suez Cement Company in 1997.
  • Constructing Egyptian Cement Company “Lafarge cement Egypt” line “1” on May 6, 1998.
  • Constructing cement factory Arish. Sinai on May 15, 2000.
  • Constructing Egyptian Cement Company “Lafarge cement Egypt” line “2” on June 11, 2000.
  • Constructing Egyptian Cement Company line “Lafarge cement Egypt “3” on June 11, 2000.
  • Constructing line “1” miser beni suef for cement on March 21, 2001.
  • Constructing Egyptian Cement Company “Lafarge cement Egypt” line “4” on July 12, 2001.
  • Constructing Qena Cement Company in 2002.
  • Constructing El Ameriya Cement Company line “3” February 3, 2003.
  • Constructing the first production line for Algerian Cement Company in Algeria on August 1, 2003.
  • Constructing the first production line for Arab Union Cement Company at Libya in august 1, 2004.
  • Constructing the second production line for Algerian Cement Company in Algeria on March 2, 2005.
  • Constructing Egyptian Cement Company “Lafarge cement Egypt”   line “5” in February 2006.
  • Constructing the first production line for Arab Emirates Cement Company for cementech in November 20, 2006.
  • Constructing production line Ciba white, grey in Algeria on April 28, 2007.
  • Constructing Arabian Cement Company” Ramliya” line “1” – Ain Sokhna  – Suez in July 2007.
  • Constructing of Cement factory in Nigeria in 2008.
  • Constructing El Menia white Cement production line in 2008.
  • Constructing Sinai white Portland Cement Company line “2” – In May 2008.
  • Constructing ARAB UNION Cement Company line “2” – Libya   – in January    2009.
  • Constructing BENI SUEF Cement Company line “2” – TITAN Cement Company in April 2009.
  • Constructing Safwa Cement Company line “1” – Jeddah –Saudi Arabia in August   2009.
  • Constructing AL-Takamel Cement project – Sudan in December 2009. 
  • Constructing Al Swedy Cement Company line “1” – Ain Sokhna – Suez in February 2010.
  • Constructing Arabian Cement Company” Ramliya” line “2” – Ain Sokhna – Suez in June 2010.
  • Constructing insulation works for a fertilizer plant in Algeria in 2012.
  • Constructing insulation works for equipment and pipes at Egyptian Indian Polyester Company at El Sokhna in 2013.
  • Constructing works of Ain Al Kabeera Cement Factory – Setif -Algeria.  March 22. 2016.
  • Constructing works, of Saudi Safwa Cement Factory March 22. 2016.
  • Constructing of Al-Bayda Cement Factory, Algeria – Orascom Cementech Limited – Dubai Branch. August 1. 2017.
  • Constructing Refractory works in the Canal Sugar Factory in Minya Governorate, contracted by the Chinese company “Sinoma” 12 -9- 2020.
Some of Our company activities for refractory, thermal insulation, sandblasting, and painting work 

Firstly: the refractory and scaffolding works: 

  • Executing the refractory works for the paper at RKTA Company in October 1980.
  • Executing the refractory works in a national company for Paper Company on September 30, 1981.
  • Executing refractory works in the boiler for El Ameriya for oils, Alexandria on November 6, 1989.
  • Executing the refractory works in RKTA Company for papers on August 20, 1990.
  • Executing refractory works in an electric power station in Damanhur.
  • Executing refractory works for kilns in Cairo bakeries.
  • Executing the refractory works in Boiler National Company for paper on September 18, 1997.
  • Executing the refractory works in Boiler National Company for paper on September 18, 1997.
  • Executing refractory works for a national company for paper in the boiler in 2001.
  • Executing refractory works in Persil Company in 2000.
  • Executing refractory works in Ezz Steel plant – Sadat in 2010.
  • Refractory works for UNION Cement Company Ltd. – Yemen 16 -2- 2015.
  • Refractory works at Zahrat Sinai Gypsum Factory – Abu Zneima 17 – 9 -2016.
  • Refractory works for Hume Cement Factory – Malaysia 15 -11- 2018.
  • Concrete spraying works, Ezz Steel, RHI Brick Contracting 15 -7- 2019.
  • Refractory works for Hume cement factory in Malaysia 26 -8- 2019.
  • Refractory works for Hume Cement Factory – Malaysia 13 -9- 2019.
  • Refractory works for UNION Cement Company Ltd. – Yemen 17 -12- 2019.
  • Refractory works in the Canal Sugar Factory in Minya Governorate, contracted by the Chinese company “Sinoma” 12 -9- 2020.
  • Refractory works for Preheating furnace at (Egyptian Iron), IIC Steel Factory Management PO # LP/S-049/2020      10 – 10 -2020.
  • To hold a contractor for the annual maintenance work including the oven, the heating tower for the installation of refractory bricks and its affiliates in the oven and heating tower, the cooling system, and the breaker to the Union Cement Company Ltd in the Republic of Yemen – abyan government –bates district. 6 – 6 -2021.
  • Refractory works at Zahrat Sinai Gypsum Factory – Abu Zneima 28 – 2 -2022.
  • Two systems of scaffolding at Helwan fertilizers company – Helwan 26 – 4 -2022.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler….. etc.  ‘for most of the work complete or partial rehabilitation done at Beni suef Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.  ‘ for most of the work complete or partial rehabilitation done in Alexandria Portland Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for most of the work complete or partial rehabilitation done at el Ameriya Cement Company” CIMPOR GROUP”. 
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for most of the work complete or partial rehabilitation done at Egyptian Cement Company “Lafarge Cement Egypt”. 
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at helwan Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Torah Cement Company until 2018.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Kattameya Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Suez Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at El Menia Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Assuit Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at El Arish Cement Company.
  • Executing refractory works ‘ kiln, Pre-heater, Cooler ….. etc. “for some of the work complete or partial rehabilitation done at Elkawmiya Cement Company Until the company was closed.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc.’ for most of the work complete or partial rehabilitation done at Miser Beni suef Cement Company.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Elswedy Cement Company.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc. “for all of the work complete or partial rehabilitation done at Arabian Cement Company” Ramliya”.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Wadi el nil Cement Company.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Medcom Aswan for Cement Company.
  • Executing all refractory work for Al-Shahin Company for Industry and Mining Abu Zenima – Saina.
  • Executing refractory work ‘ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Royal EL Minya Cement Company.
  • Executing refractory work’ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Southern Valley Cement factory – Beni Suef.
  • Executing refractory work’ kiln, Pre-heater, Cooler ….. etc.’ for some of the work Complete or partial rehabilitation done at National Cement Company Complex (Beni Suief & Suhag & Arish 3,4) from Chengdu Design & Research Institute of Building Materials Industry Co., Ltd. Egypt Branch (CDI) Chinese.
  • Executing refractory work’ kiln, Pre-heater, Cooler ….. etc.’ for some of the work complete or partial rehabilitation done at Arish cement company (Arish 1,2) from Tianjin cement industry Design and Research Institute company Chinese.

 

Secondly: thermal insulation and scaffolding works 

    • Executing the thermal insulation works in RKTA Company for paper in October 1980.
      Executing the thermal insulation works in a national company for Paper Company on September 30, 1981.
    • Executing the thermal insulation works for the nitroglycerin plant in Abu Zaabal fertilizer & chemical company on June 7, 1982.
  • Executing the thermal insulation works in Abu Zaabal fertilizer & chemical company on February 23, 1983.
  • Executing the thermal insulation works supply and erection in Kattameya Cement Company about 12000 m2 on January 3, 1984.
  • Executing the thermal insulation works in Nasr Company for the manufacture of coke on January 3, 1984.
  • Executing the thermal insulation works in the American Egyptian company for paints 12-1986.
  • Executing the thermal insulation works in the Autoclave at Aboroash on October 8, 1988.
  • Executing the thermal insulation works gypsum plant in Ras Malab, Sinai in November 9, 1987.
  • Executing the thermal insulation works in boiler for el Ameriya Petroleum, Alexandria. In November 6, 1989.
  • Executing the thermal insulation works in el Talbet plant for iron and steel complex in December 11, 1989.
  • Executing the thermal insulation works in RKTA. Company in August 20, 1990.
  • Executing the thermal insulation works for the boiler in El Ameriya Petroleum, Alexandria. on December 5, 1990.
  • Executing the thermal insulation works for international steel in El Sadat town on October 1, 1995.
  • Achievement of the thermal insulation works in Helwan Cement Company in October 1999.
  • Executing the thermal insulation works in Egyptian Fertilizer Company in Suez in October 1999.
  • Executing the thermal insulation works for E.C.C in June 2000.
  • Executing the thermal insulation works for the Electric power station. Ain Sokhna  , October 2001 .
  • Executing the thermal insulation works for an electric power station. East port said, October 2001.
  • Executing the thermal insulation works for S.C.C, El kattamya in 2001.
  • Executing rehabilitation for the thermal insulation works in Egyptian Fertilizer Company in Suez 2001.
  • Executing the thermal insulation works for Amoke for Oils in 2002.
  • Executing the thermal insulation works for the Damietta LNG insulation project on May 29. 2004.
  • Executing the Thermal insulation works for the fertilizer factory in Oran – Algeria.    March 30. 2011.
  • Executing the Thermal insulation works for the Egyptian Indian Company for Polyester. April 3. 2013.
  • Executing the Thermal insulation works at Fuheis Cement Factory. Jordan. September 12. 2013.
  • Executing the Thermal insulation works at the Al-Kubaisah cement factory. Iraq.         September 17. 2013.
  • Executing the Thermal insulation works at the Rashidiya cement factory. Jordan.   October 17. 2013.
  • Executing the Thermal insulation works in the Egyptian Indian Company in Ain Sokhna. February 7. 2015.
  • Executing the Thermal insulation works for the Kima Ammonia &Urea Plant Project-Aswan. October 10. 2018.
  • Executing the Thermal insulation works for EL Sewedy cement company PO # 210509. June 1. 2021.
  • Executing the Supply and installation of thermal insulation including scaffolding for the development of Mill No. 8 at Helwan Cement Factory. November 8. 2021.
  • Executing the Thermal insulation works for the turbine at Kima Aswan Company. March 10. 2022.

 

Thirdly: thermal insulation and scaffolding works 

    • Executing the sandblasting and painting works in the  pre-heater and kiln for El Ameriya Cement Company.
    • Executing the sandblasting in the kiln body of both Assuit Cement Company and Beni Sueif Cement Company.
    • Executing the sandblasting and painting works in Asecc Company for casting and heat treatment and ” ARESCO ” projects such as: – –  Sandblasting and painting work for all manufacturing equipment for Helwan Cement Company. –  Sandblasting and painting work for all manufacturing equipment for Qena Cement Company. –  Sandblasting and painting work for all manufacture equipment for el Arish Cement Company in Sinai. –  Sandblasting and painting work for all manufacturing equipment for Assiut Cement Company. –  Sandblasting and painting work for all manufacture equipment for north Cairo electric power station. –  Sandblasting and painting work for all manufacture equipment for a cement factory in Qatar. –  Sandblasting and painting work for all manufacture equipment for cement factory in Costa Rica, South America. – Sandblasting and painting work for all manufacture equipment for the cement factory at Yamen. –  Sandblasting and painting work for all manufacturing equipment for a cement factory in Pennsylvania U S A. – Sandblasting and painting work for all manufacturing equipment for Jordan Cement Company. –  Sandblasting and painting work for all manufacturing equipment for An electric power station in Puerto Rico city in South America.
    • Executing the sandblasting and painting works for reliance heavy industries company projects such as: – –  Sandblasting and painting work for all manufacturing equipment for Qatar Cement Company. – Sandblasting and painting work for all manufacture equipment for El Qassim Cement Company.
    • Sandblasting and painting work for all manufacture equipment for the stars mill. Suez.
    • Sandblasting parts of the internal kiln shell in some Cement Factories when work requires it.
    • Sandblasting some ID fans and cooler fans in some Cement Factories when work requires it. 8- Sandblasting and painting for some cement mill torsion shafts at some Cement Factories when the work requires it.
  •  
Some mechanical rehabilitation projects Which executed in cement companies in Egypt 
 
  • Maintenance work at Assuit Cement Company, 2001.
  • Maintenance work at Suez Cement Company, 2001.
  • Maintenance work at Kattameya Cement Company, 2002.
  • Maintenance work at El Menia Cement Company .2002.
  • Maintenance work at Beni suef Cement Company .2003. 
  • Maintenance work at Helwan Cement Company, 2004.
  • Maintenance work at Tourah Cement Company, 2005.
  • Maintenance work at Ameriya Cement Company, 2005.
  • Maintenance work at Tourah Cement Company, 2005.
  • Maintenance work at Beni Sueif Cement Company. March 16, 2005.
  • Maintenance work at Beni Sueif Cement Company, September 15, 2005.
  • Maintenance work at Beni Sueif Cement Company, September 16, 2006.
  • Maintenance work at Beni Sueif Cement Company, February 16, 2007.
  • Maintenance work at Beni Sueif Cement Company, June 15, 2007. * Manufacturing & erection for the BENI SUEF complete Rehabilitation of BSF ESP filters project for two raw mills filters.
  • Maintenance work at Tourah Cement Company, June 10, 2007.
  • Maintenance work at Beni Suef Cement Company, January 6, 2008 –  Changing ducts under C4A /B.
  • Maintenance work at Alexandria Portland Cement Company, February 6, 2008.
  • Maintenance work at Tourah Cement Company, February 13, 2008.
  • Maintenance work at Kattameya Cement Company, November 2008.
  • Maintenance work at Alexandria Portland Cement Company, January 6, 2009.
  • Maintenance work at Suez Cement Company line “1”, February 2009. 
  • Maintenance work at Suez Cement Company line “2”, March 2009.
  • Maintenance work at Beni Suef Cement Company, April l2, 2009.
  • Maintenance work at Suez Cement Company line “1”, June 2009.
  • Maintenance work at Alexandria Portland Cement Company, July 21, 2009.
  • Maintenance work at Beni Suef Cement Company, November 2009.
  • Maintenance work at Arabian Cement Company “Ramliya” line “1”, January 21, 2010.
  • Maintenance work at Egyptian Cement Company line “1” Lafarge cement Egypt”, March 3, 2010.
  • Maintenance work at Alexandria Portland Cement Company, March 24, 2010.
  • Maintenance work at Beni Suef Cement Company line 2, May 18, 2010.
  • Maintenance work at Beni Suef Cement Company line 1, June 9, 2010.
  • Maintenance work at Beni Suef Cement Company line 2, September 15, 2010..
  • Maintenance work at Alexandria Portland Cement Company, October 16, 2010.
  • Maintenance work at Beni Suef Cement Company line”1″, January 10, 2011.
  • Maintenance work at Alexandria Portland Cement Company, May 23, 2011.
  • Maintenance work at Beni Suef Cement Company line 1, July   4, 2011.
  • Maintenance work at Alexandria Portland Cement Company, December 12, 2011.
  • Maintenance work at Wadi EL Nil Cement Company, March 3, 2012.
  • Maintenance work at Beni Suef Cement Company line 1, March 11, 2012.
  • Maintenance work at Beni Suef Cement Company line 2, April 29, 2012.
  • Maintenance work at Arabian Cement Company “Ramliya” line 2, May 1, 2012.
  • Maintenance work at Alexandria Portland Cement Company, June 3, 2012.
  • Maintenance work at Beni Suef Cement Company line 1, September 1, 2012.
  • Maintenance work at Elkawmiya Cement Company line 3, September 16, 2012.
  • Maintenance work at Alexandria Portland Cement Company, January 8, 2013.
  • Maintenance work at Beni Suef Cement Company line 1, February 13, 2013.
  • Maintenance work at Elkawmiya Cement Company line 4, February 19, 2013.
  • Maintenance work at Arabian Cement Company “Ramliya” line 1, March 24, 2013.
  • Maintenance work at Beni Suef Cement Company line 2, May 24, 2013.
  • Maintenance work at Elkawmiya Cement Company line 3, June 14, 2013.
  • Maintenance works at Wadi El Nil Cement Company, June 27, 2013.
  • Maintenance work at Arabian Cement Company “Ramliya” line 2, August 1, 2013.
  • Pipe welding work in Zohr gas plant- Port Said, contracted by Kahromika  Misr Company for Mechanical and Electrical Projects. August 15, 2013.
  • Maintenance work at Alexandria Portland Cement Company, August 25, 2013.
  • Maintenance work at Wadi EL Nil Cement Company, August 27, 2013.
  • Maintenance work at Beni Suef Cement Company line 1, September 20, 2013.
  • Maintenance work at Beni Suef Cement Company line 2, November4, 2013.
  • Maintenance work at Arabian Cement Company “Ramliya” line 1, March 30, 2014.
  • Maintenance work at Beni Suef Cement Company, April 9, 2014.
  • Maintenance work at Helwan Cement Company line “1”, September 15, 2014.
  • Maintenance work at Arabian Cement Company “Ramliya” line 2, November 11, 2014.
  • Maintenance work at Helwan Cement Company line “2”, January 11, 2015.
  • Maintenance work at South Wadi Cement Company line “2”, February 11, 2015.
  • Maintenance work at Beni Suef Cement Company, March 21, 2016.
  • Mechanical works at Alexandria Portland cement Company April 2, 2016.
  • Maintenance work at Beni Suef Cement Company, November 5, 2016.
  • Mechanical works for cement factory, South Valley February 18, 2017.
  • Maintenance work at Elswedy Cement Company, March 5, 2017.
  • Mechanical works at Alexandria Portland Cement Company. July 14, 2017.
  • Maintenance work at Elswedy Cement Company, March 2 5, 2018.
  • Maintenance work at Kattamia cement plant. September 20, 2018.
  • Mechanical works at Alexandria Portland cement Company November 11, 2018.
  • Mechanical works for cement factory, South Valley November 29, 2018.
  • Mechanical works at Arabian Cement Factory, March 27, 2019.
  • Maintenance work at El Swedy Cement Company, December 11, 2018.
  • Mechanical works for the Cement Factory of the National Cement Company, line No. 3 Contracted by the Chinese company SINOMA. September 12, 2019.
  • Mechanical works for the cement factory of the National Cement Company, line No. 1 Contracted by the Chinese company SINOMA. October 6, 2019.
  • Mechanical works for the cement factory of the National Cement Company, line No. 5 Contracted by the Chinese company SINOMA on October 15, 2019.
  • Mechanical works for the cement factory of the National Cement Company, line No. 6 Contracted by the Chinese company SINOMA. October 22, 2019.
  • Mechanical works at Beni Suef cement company, November 20, 2019.
  • Mechanical works for the cement factory of the National Cement Company, line No. 2 Contracted by the Chinese company SINOMA. December 6, 2019.
  • Mechanical works for UNION Cement Company Ltd. – Yemen. December 17, 2019.
  • Mechanical works for the cement factory of the National Cement Company, line No. 4 Contracted by the Chinese company SINOMA. February 3, 2020.
  • Mechanical works at Arabian Cement Factory, February 29, 2020.
  • Mechanical works at Arabian cement factory, March 21, 2020.
  • Mechanical works at Beni Suef cement company, August 18, 2020.
  • Mechanical works for the cement factory of the National Cement Company, line No. 2 Contracted by the Chinese company SINOM. October 6, 2020.
  • Mechanical works at Arabian Cement Factory, January 5, 2021.
  • Mechanical works at MISR BENI SUIF cement company PO #20210493. March 19, 2021.
  • Mechanical works at Alexandria Portland Cement Company, June 6, 2021.
  • Mechanical works at Beni Suef cement company, June 26, 2021.
  • Mechanical works at Arabian Cement Factory, July 3, 2021.
  • Mechanical works at Arabian Cement Factory, September 26, 2021.
  • Mechanical works at Amreyah Cement Company line 3 October 24, 2021.
  • Mechanical works at MISR BENI SUIF cement company               February 9, 2022.
  • Mechanical works at Arabian cement factory, March 15, 2022.
  •  
Some Projects Executed outside of Egypt
 
  • Algerian Cement Company in Algeria – Constructing the first production line for the Algerian Cement Company in Algeria.
    – Refractory                              2314 ton
    – Insulation                                25585 m2
    – cladding                                  50462 m2
    – spraying thermal concrete      441   ton  
    – Erect required scaffolding.
  • Jordan Cement Company Rehabilitation of rashadiah plant and fuhais Plants, Jordan Cement Company in EL Hashemite Kingdom of Jordan including refractory, erect stainless anchors, and Insulation.
    – Erect required scaffolding.
  • Arab Union Cement Company in Libya Constructing the first production line for Arab Union Cement Company in Libya
    – Refractory                               3600 ton
    – Insulation                                3800 m2
    – cladding                                   25000 m2
    – Erect required scaffolding.
  • Algerian Cement Company in Algeria Constructing the second production line for Algerian Cement Company in Algeria
    – Refractory                                2313 ton
    – Insulation                                 25585 m2
    – cladding                                   48500 m2
    -spraying thermal concrete     411 ton
    – Erect required scaffolding.
  • Jordan Cement Company
    – First rehabilitation works for filters production lines no. 1, 2 for Rashadiah Plant, Jordan Cement Company in EL Hashemite Kingdom of Jordan whereas the rehabilitation included the following works: 
    – complete maintenance for diffusers in the inlet and between the first & second compartments.
    –  Removing and erecting the collection plates and electrodes.
    – Inside and outside cladding.
    – Refractory lining works for lines production no. 1, 2.
    – Changing the stake and insulating it. Duration work for line no.1 is 15 days and line no.2, is 15 days too.
    – Erect required scaffolding.
  • Iraq Cement Company in Kurdistan Rehabilitation in Iraq Cement Company in Kurdistan.  Major-
    – Erect required scaffolding. 
  • Alamaryh Cement Company for Cementech Limited Constructing the first production line for Alamartyh Cement Company for Cementech Limited, Fujairah branch in the United Arab Emirates
    – Refractory                               4220 ton
    – Insulation                                45260 m2
    – spraying thermal concrete   21-ton
    – Erect required scaffolding.
  • Jordan Cement Company  Second rehabilitation work for Rachidia Plant, Jordan Cement Company in EL Hashemite Kingdom of Jordan the rehabilitation including the following:
    – completing maintenance for diffusers in the inlet and between the first & second compartments, maintenance filter production line no.1, and change the required plates, electrodes, insulation, cladding, and maintenance within 8 days hammering system
    – maintenance of the filter production line 2 and changing all the plates, inside Cladding and adjusting the hammering system required electrodes Within 13 days only.
    – making rehabilitation at the first and second kiln refractory lining.
    – Erect required scaffolding.
  •  Rachidia Plant Jordan Complete Rehabilitation of the two lines of existing electrostatic precipitators Rachidia Plant Jordan Cement Company in EL Hashemite Kingdom of Jordan, within 20 days.
    – Erect required scaffolding.
  • Rachidia Plant Jordan 10 Removing, erecting new ESP STACK, sandblasting, painting from outside, and then insulating it after that in Rshadiah Plant, Jordan cement company at the EL Hashemite Kingdom of Jordan.
    – Erect required scaffolding.
  • Production line CIBA white /grey in Algeria Constructing production line CIBA white /grey in Algeria
    – Refractory                               4435 ton
    – Insulation                                45485 m2
    – cladding                                  68441 m2
    – Erect required scaffolding.
  • Refractory and insulation at “NIGERIA”. Constructing of Cement production line “Refractory and insulation At “NIGERIA”.
    – Refractory                                     ton
    – Insulation                                 30095 m2
    – Erect required scaffolding.
  • ARAB UNION Cement Company Constructing ARAB UNION Cement Company line “2”
    – Libya.
    – Erect required scaffolding.
  • Takamel Cement Project – Sudan Constructing AL-Takamel Cement Project  – Sudan.
    – Refractory                               2466, 9 ton
    – Erect required scaffolding
  • AL Safwa Cement Company Constructing AL Safwa Cement Company line “1” – Jeddah –Saudi Arabia.-
    – Refractory                               2838,706 ton
    – Insulation                                21250 m2
    – Erect required scaffolding.
  • Mass Jordan Cement project – Sudan. – Partial rehabilitation for tertiary air duct at   Mass Jordan Cement project – Sudan.-
    – Refractory                               202, 7 ton.
  • AL-Salaam Cement project – Sudan. Partial rehabilitation for kiln and pre-heater at   AL-Salaam Cement project – Sudan. –
    – Refractory                               241 ton
    – Erect required scaffolding.
  • Syrian Cement Company Constructing the insulation work for Syrian Cement Company line “1” – Syria.
    – Insulation                                 19289 m
    – Erect required scaffolding.
  • Fertilizer Plant in Algeria – Constructing insulation works for a fertilizer Plant in Algeria.
    – Insulation                                 21250 m2
    – Erect required scaffolding.
  • Kubaisah Cement Plant – Iraq. –  Insulation works at Kubaisah Cement Plant – Iraq.
    – Insulation works.                                   713 m2
    – Erect required scaffolding.
  • Kubaisah Cement Plant – Iraq. –  Refractory works for production lines “1&2” and insulation works for filters at Kubaisah Cement Plant – Iraq.
    – Refractory work ‘kiln, cooler ”           365 ton
    – Insulation works.                                1185 m2
    – Erect required scaffolding.
  • Rachidia Plant Jordan –  Insulation works for Rachidia Plant Jordan Cement Company in EL Hashemite Kingdom of Jordan.
    – Insulation works.                                 1650 m2
    – Erect required scaffolding.
  • UNION CEMENT CO. Ltd At “State of Yemen”. – Major rehabilitation for the production line of UNION CEMENT CO. Ltd A t  “State of Yemen”.
    – Refractory work ‘kiln, preheater, cooler ”        277 ton
    – Erect required scaffolding.
  • Kubaisah Cement Plant – Iraq –  Refractory works for production line “1” at Kubaisah Cement Plant – Iraq.
    – Refractory work ‘kiln, cooler ”        461 ton
    – Erect required scaffolding.
Some of Our company activates for refractory and Mechanical maintenance works
 
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Tabuk Company Factory since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Yamama Cement Factory since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Jouf Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Qassim Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) for Arabian Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Saudi Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at White Cement Company Riyadh Saudi Arabia, since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Al Safwa Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Eastern Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Yanbu Cement Company since their cooperation with us until now.
  • Execution of most major and minor overhauls (refractories & mechanics & scaffolding) at Northern Region Cement Company since their cooperation with us until now.
  • Executing the refractory works at Beni suef Cement Company.,31-1-2022.
  • Executing the refractory and the Mechanical maintenance works at Misr Beni suef Cement Company,9-2-2022.
  • Mechanical maintenance works for Alexandria Portland Cement Company,7-3-2022.
  • Executing the refractory, scaffolding and sanding works for Alexandria Portland Cement Company,7-3-2022.
  • Mechanical maintenance works for EL Ameriya   Cement Factory, Line No. 3,10-6-2022.
  • Executing the refractory works for EL Ameriya   Cement Factory, line NO.3,10-6-2022.
  • Executing the scaffolding works for Alexandria Portland Cement Company,18-6-2022.
  • Executing the refractory works for Alexandria Portland Cement Company,18-6-2022.
  • Executing the refractory works line NO.,2 for Arish Cement from Tianjin cement industry Chinese company.,15-7-2022.
  • Supplying various technical workers for Assuit Cement Co. line NO.1,1-10-2022.
  • Executing the scaffolding works at Assuit Cement Co. line NO.1,1-10-2022.
  • Executing the refractory works at Assuit Cement Co. line NO.1,1-10-2022.
  • Mechanical maintenance works for Alexandria Portland Cement Company,8-10-2022.
  • Executing the refractory works line NO.1&5 for Chengdu Design & Research Institute Chinese company at Beni Suef,23-10-2022.
  • Executing the refractory works at Sinai White Cement Factory – Arish,24-10-2022.
  • Executing the refractory works line NO.3 for Chengdu Design & Research Institute Chinese company at beni suef,19-11-2022.
  • Executing the refractory works line NO.4 for Chengdu Design & Research Institute company at beni suef,20-11-2022.
  • Executing the refractory works line NO.2 for Arish Cement company from Tianjin cement industry company.,22-11-2022.
  • Executing the refractory works for Assuit Cement Co. line NO.3,12-12-2022.
  • Executing the refractory works line NO.2 for Chengdu Design & Research Institute Chinese company at beni suef,12-12-2022.
  • Executing the refractory works line NO.1 for Arish Cement from Tianjin cement industry Chinese company.,29-12-2022.
  • Executing the refractory works line NO.3 for Chengdu Design & Research Institute company at beni suef,1-2-2023.
  • Mechanical maintenance works at Beni suef Cement Company, Line No. 1,7-3-2023.
  • Supplying various technical workers for Assuit Cement Co.,31-3-2023.
  • Mechanical maintenance works for EL Ameriya   Cement Factory, Line No. 1,26-4-2023.
  • Executing the refractory works for EL Ameriya   Cement Factory, line NO.1,26-4-2023.
  • Executing the refractory works line NO.,2 for Arish Cement from Tianjin cement industry company.,11-5-2023.
  • Mechanical maintenance works at Beni suef Cement Company, Line No. 2, 14-5-2023.
  • Mechanical maintenance works for EL Ameriya   Cement Factory, Line No. 3, 24-5-2023.
  • Executing the refractory works for EL Ameriya Cement Co. Line NO.3,  24-5-2023.
  • Executing the refractory works line NO.1 for Arish Cement from Tianjin cement industry Chinese company.,3-6-2023.
  • Supplying various technical workers for Assuit Cement Co,10-8-2023.
  • Mechanical maintenance works foe lines NO.1,2 for Arish Cement from Tianjin cement industry Chinese company., 17-8-2023.
  • Executing the scaffolding works at Beni suef Cement Company . line NO.2, 1-9-2023.
  • Executing the refractory works at Beni suef Cement Company. line NO.1, 1-9-2023.
  • Supplying various technical workers for Assuit Cement Co. line NO.1, 1-10-2023.
  • Executing the scaffolding works at Assuit Cement Co. line NO.1, 1-10-2023.
  • Executing the refractory works at Assuit Cement Co. line NO.1, 1-10-2023.
  • Executing the refractory works at Suez Cement company line 2. 20-11-2023.
  • Concrete spraying for Asfour Mining and Refractories Company in Port Said, 21-11-2023.
  • Executing the refractory works at Arabian Cement C.,20-12-2023.
  • Supplying various technical workers for Arabian Cement C.20-12-2023.
  • Executing the refractory works line NO.1 for EL Ameriya Cement Company, 21-12-2023.
  • Scaffolding, Brick lining, and castable work ,kiln shutdown, at Hail Cement ,1-2024.
  • Refractory works for the furnace of the Suez Steel Factory – Suez.,24-1-2024.
  • Executing the refractory works at Kattameya Cement C.30-1-2024.
  • Mechanical maintenance work for the Arabian Cement Factory, Line No. 1, 8-2-2024.
  • Executing the refractory works for the Arabian Cement Factory, line NO.1, 8-2-2024.
  • Change cyclone roof at Sinai Cement Factory, Ramadi, Al-Arish,15-2-2024.
  • Executing the refractory works at Sinai Cement Factory, Ramadi, Al-Arish.,15-2-2024.
  • Turnkey project for replacement of chimney for line1, at Northern Region Cement Company (NRCC),3-2024.
  • Executing the scaffolding works for line NO.3 at Assuit Cement Co.,4-3-2024.
  • Executing the refractory works for line NO.3 at Assuit Cement Co.4-3-2024.
  • Kiln Supporting outlet Roller Shaft Repair by Lathe Machine in Qassim Cement company ,4-2024.
  • Overhauling and repairing rotary feeder and replacing the bearings and rotary lagging for Kiln# 3 Raw mill area ,Qassim Cement company,4-2024.
  • Executing the refractory and Mechanical maintenance works for lines NO.1,2 at Arish Cement from Tianjin cement industry Chinese company.,13-4-2024.
  • Chimney Fabrication , Riser Duct Line #1,Northern Region Cement company (NRCC),5,2024.
  • Demolishing, cleaning, installation, and kiln relining,City Cement Company ,5-2024.
  • replacement of the impeller for FN1 Line #3, Qassim Cement Company,5-2024.
  • Mix Reclaimer Line 2 Overhaul, Alsafwa Cement Company,5-2024.
  • Mechanical maintenance works for the Arabian Cement Factory, Line No. 2, 18-5-2024.
  • Executing the refractory works for the Arabian Cement Factory, Line No. 2,18-5-2024.
  • Refractory, Mechanical maintenance, and Scaffolding work for kilns 1 and 2, Alsafwa Cement Company,6-2024.
  • Kiln bricks, preheater bricks, EP filter, and Raw mill,Sinai Grey Cement Factory Line 2 ,7-2024.
  • installation of the alternative fuel system component for Line 1, Sinai Cement Co. – Vicat Group.,9-2024.